Item List 051205 |
Date:06/01/2018 |
|
RTF Report: CATITEM |
KENTUCKY TRANSPORTATION CABINET
Contract ID | 051205 | Primary Project Number | DE011150B0505 |
Contract Description | DANVILLE BYPASS (KY150) | ||
Primary County | BOYLE | Fed/St Number | FD04 011 150B 000-003 |
Vendor ID | 00135 | Vendor Name | THE ALLEN COMPANY INC |
Bid Amount | $ 4,067,091.20 |
SM- Project | DE011150B0505 |
Fed/State Number | FD04 011 150B 000-003 |
Project Description | DANVILLE BYPASS (KY150) |
*********** |
SM- Project | DE011150B0505 | CATEGORY NUMBER | 0001 | CATEGORY Description | ROADWAY |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0010 | DGA BASE | 00001 | 47,631.000 |
56,631.000 |
$11.340 |
TON | 13.3 |
0020 | DRAINAGE BLANKET-TYPE II-ASPH | 00018 | 10,098.000 |
10,098.000 |
$21.650 |
TON | 5.4 |
0030 | TRAFFIC BOUND BASE | 00020 | 500.000 |
500.000 |
$14.740 |
TON | 0.2 |
0040 | CRUSHED AGGREGATE SIZE NO 2 | 00078 | 15,700.000 |
15,700.000 |
$8.750 |
TON | 3.4 |
0050 | ASPHALT SEAL AGGREGATE | 00100 | 266.670 |
800.010 |
$42.850 |
TON | 0.3 |
0060 | CL3 ASPH BASE 1.50D PG64-22 | 00205 | 26,436.000 |
26,436.000 |
$28.270 |
TON | 18.4 |
0070 | CL2 ASPH BASE 1.00D PG64-22 | 00212 | 8,162.000 |
8,162.000 |
$29.120 |
TON | 5.8 |
0080 | CL3 ASPH BASE 1.00D PG76-22 | 00216 | 12,044.000 |
12,044.000 |
$33.520 |
TON | 9.9 |
0090 | EMULSIFIED ASPHALT RS-2 | 00291 | 32.000 |
96.000 |
$275.000 |
TON | 0.2 |
0110 | CL2 ASPH SURF 0.50D PG64-22 | 00309 | 2,938.000 |
2,938.000 |
$37.720 |
TON | 2.7 |
0120 | CL3 ASPH SURF 0.50A PG76-22 | 00332 | 6,543.000 |
6,568.000 |
$45.020 |
TON | 7.2 |
0130 | ASPHALT PLACEMENT WITH MTV | 00338 | 17,021.000 |
17,021.000 |
$1.050 |
TON | 0.4 |
0140 | ASPHALT CURING SEAL | 00358 | 53.830 |
53.830 |
$268.000 |
TON | 0.4 |
0150 | ENTRANCE PIPE-15 INCH | 00440 | 128.000 |
128.000 |
$27.000 |
LF | 0.1 |
0160 | ENTRANCE PIPE-18 INCH | 00441 | 86.000 |
86.000 |
$24.000 |
LF | 0.1 |
0170 | ENTRANCE PIPE-15 INCH EQUIV | 00450 | 28.000 |
28.000 |
$24.000 |
LF | 0.0 |
0180 | CULVERT PIPE-15 INCH | 00461 | 174.500 |
174.500 |
$26.500 |
LF | 0.1 |
0190 | CULVERT PIPE-18 INCH | 00462 | 1,186.500 |
1,186.500 |
$35.750 |
LF | 1.0 |
0200 | CULVERT PIPE-24 INCH | 00464 | 141.500 |
141.500 |
$38.000 |
LF | 0.1 |
0210 | CULVERT PIPE-30 INCH | 00466 | 198.500 |
198.500 |
$52.000 |
LF | 0.3 |
0220 | CULVERT PIPE-36 INCH | 00468 | 65.500 |
65.500 |
$70.000 |
LF | 0.1 |
0230 | CULVERT PIPE-42 INCH | 00469 | 53.000 |
53.000 |
$85.000 |
LF | 0.1 |
0240 | CULVERT PIPE-18 INCH EQUIV | 00491 | 60.000 |
60.000 |
$35.000 |
LF | 0.1 |
0250 | PERFORATED PIPE-4 INCH | 01000 | 16,834.000 |
17,134.000 |
$4.200 |
LF | 1.7 |
0260 | NON-PERFORATED PIPE-4 INCH | 01010 | 612.000 |
612.000 |
$12.000 |
LF | 0.2 |
0270 | PERF PIPE HEADWALL TY 1-4 INCH | 01020 | 4.000 |
4.000 |
$508.000 |
EACH | 0.1 |
0280 | PERF PIPE HEADWALL TY 3-4 INCH | 01028 | 8.000 |
8.000 |
$558.000 |
EACH | 0.1 |
0290 | PERF PIPE HEADWALL TY 4-4 INCH | 01032 | 33.000 |
33.000 |
$558.000 |
EACH | 0.5 |
0300 | SLOPED BOX OUTLET TYPE 1-18 IN | 01433 | 1.000 |
1.000 |
$1,315.000 |
EACH | 0.0 |
0310 | S & F BOX INLET-OUTLET-18 INCH | 01450 | 8.000 |
8.000 |
$2,000.000 |
EACH | 0.4 |
0320 | DROP BOX INLET TYPE 1 | 01490 | 1.000 |
2.000 |
$2,900.000 |
EACH | 0.1 |
0330 | DROP BOX INLET TYPE 5B | 01505 | 16.000 |
16.000 |
$2,900.000 |
EACH | 1.1 |
0340 | CAP DROP BOX INLET | 01584 | 1.000 |
1.000 |
$695.000 |
EACH | 0.0 |
0350 | BARRICADE-TYPE III | 02014 | 28.000 |
28.000 |
$225.000 |
EACH | 0.2 |
0360 | REMOVE PAVEMENT | 02091 | 563.000 |
563.000 |
$2.500 |
SQYD | 0.0 |
0370 | ROADWAY EXCAVATION | 02200 | 129,190.000 |
129,190.000 |
$3.520 |
CUYD | 11.2 |
0380 | GUARDRAIL-STEEL W BEAM-S FACE | 02351 | 1,400.000 |
2,057.500 |
$15.000 |
LF | 0.5 |
0390 | GUARDRAIL END TREATMENT TYPE 1 | 02367 | 2.000 |
3.000 |
$2,858.000 |
EACH | 0.1 |
0400 | GUARDRAIL END TREATMENT TYPE 2A | 02369 | 2.000 |
3.000 |
$550.000 |
EACH | 0.0 |
0410 | R/W MARKER RURAL TYPE 1 | 02434 | 7.000 |
7.000 |
$71.750 |
EACH | 0.0 |
0420 | CHANNEL LINING CLASS II | 02483 | 1,501.500 |
2,701.500 |
$19.850 |
TON | 0.7 |
0430 | CLEARING AND GRUBBING 37.67 ACRES | 02545 | 1.000 |
1.000 |
$8,500.000 |
LS | 0.2 |
0440 | CONCRETE-CLASS B | 02555 | 145.850 |
171.860 |
$305.000 |
CUYD | 1.1 |
0450 | SIGNS | 02562 | 256.000 |
1,413.000 |
$6.500 |
SQFT | 0.0 |
0460 | EDGE KEY | 02585 | 1,379.000 |
1,379.000 |
$4.550 |
LF | 0.2 |
0470 | FABRIC-GEOTEXTILE TYPE IV | 02599 | 53,021.000 |
53,021.000 |
$0.750 |
SQYD | 1.0 |
0480 | MAINTAIN & CONTROL TRAFFIC | 02650 | 1.000 |
1.000 |
$35,000.000 |
LS | 0.9 |
0490 | DIVERSIONS (BY-PASS DETOURS) | 02651 | 1.000 |
1.000 |
$1,000.000 |
LS | 0.0 |
0500 | TEMPORARY SILT FENCE | 02701 | 250.000 |
250.000 |
$3.250 |
LF | 0.0 |
0510 | SAND FOR BLOTTER | 02702 | 134.580 |
134.580 |
$20.500 |
TON | 0.1 |
0520 | SILT CHECK TYPE II | 02705 | 55.000 |
55.000 |
$85.000 |
EACH | 0.1 |
0530 | CLEAN SILT CHECK TYPE II | 02708 | 165.000 |
165.000 |
$30.000 |
EACH | 0.1 |
0540 | CLEAN TEMPORARY SILT FENCE | 02709 | 750.000 |
750.000 |
$3.250 |
LF | 0.1 |
0550 | STAKING | 02726 | 1.000 |
1.000 |
$20,000.000 |
LS | 0.5 |
0560 | EROSION CONTROL BLANKET | 05950 | 4,482.000 |
4,482.000 |
$1.130 |
SQYD | 0.1 |
0570 | TEMPORARY MULCH | 05952 | 11,951.000 |
11,951.000 |
$0.140 |
SQYD | 0.0 |
0580 | TEMP SEEDING AND PROTECTION | 05953 | 23,900.000 |
23,900.000 |
$0.180 |
SQYD | 0.1 |
0590 | TOPDRESSING FERTILIZER | 05966 | 0.690 |
0.690 |
$400.000 |
TON | 0.0 |
0600 | SEEDING AND PROTECTION | 05985 | 119,508.000 |
119,508.000 |
$0.230 |
SQYD | 0.7 |
0610 | SPECIAL SEEDING CROWN VETCH | 05989 | 18,244.000 |
18,244.000 |
$0.180 |
SQYD | 0.1 |
0620 | TRENCHING | 06427 | 11,842.000 |
11,842.000 |
$1.550 |
LF | 0.5 |
0630 | PAVE STRIPING-TEMP PAINT-4 IN | 06510 | 32,340.000 |
32,340.000 |
$0.100 |
LF | 0.1 |
0640 | PAVE STRIPING-PERM PAINT-4 IN | 06514 | 56,818.000 |
56,818.000 |
$0.100 |
LF | 0.1 |
0650 | PAVE MARKING-THERMO STOP BAR-24IN | 06568 | 264.000 |
264.000 |
$6.000 |
LF | 0.0 |
0660 | PAVE MARKING-PRE THERM CURV ARROW | 06574 | 69.000 |
69.000 |
$60.000 |
EACH | 0.1 |
0670 | PAVE MARKING-PRE THERM COMB ARROW | 06575 | 5.000 |
5.000 |
$80.000 |
EACH | 0.0 |
0680 | PAVEMENT MARKER TY IVA-BY TEMP | 06588 | 496.000 |
496.000 |
$3.750 |
EACH | 0.0 |
0690 | PAVEMENT MARKER TYPE V-MW | 06589 | 180.000 |
180.000 |
$14.000 |
EACH | 0.1 |
0700 | PAVEMENT MARKER TYPE V-B W/R | 06592 | 241.000 |
241.000 |
$14.000 |
EACH | 0.1 |
0710 | STRUCTURE EXCAVATION-COMMON | 08001 | 150.000 |
282.085 |
$25.000 |
CUYD | 0.1 |
0720 | CONCRETE-CLASS A | 08100 | 29.100 |
37.590 |
$830.000 |
CUYD | 0.6 |
0730 | STEEL REINFORCEMENT | 08150 | 908.000 |
908.000 |
$1.000 |
LB | 0.0 |
0740 | SILT TRAP TYPE C | 20496NS843 | 18.000 |
18.000 |
$140.000 |
EACH | 0.1 |
0750 | CLEAN SILT TRAP TYPE C | 20497NS843 | 54.000 |
54.000 |
$140.000 |
EACH | 0.2 |
7000 | GUARDRAIL TERMINAL SECTION NO 1 | 02360 | 0.000 |
1.000 |
$75.000 |
EACH | 0.0 |
7001 | REMOVE GUARDRAIL END TREATMENT | 02396 | 0.000 |
1.000 |
$200.000 |
EACH | 0.0 |
7002 | DELINEATOR FOR GUARDRAIL-WHITE | 01982 | 0.000 |
4.000 |
$10.000 |
EACH | 0.0 |
7003 | PAVE MARKING-DOTTED LANE EXTEN | 06572 | 0.000 |
125.000 |
$4.300 |
LF | 0.0 |
7004 | PAVE MARKING-PRE THERM STR ARROW | 06573 | 0.000 |
1.000 |
$65.000 |
EACH | 0.0 |
7005 | EW~ Remove Thermo Straight Arrow | 10094NX | 0.000 |
1.000 |
$45.000 |
EACH | 0.0 |
8000 | PAVE STRIPING REMOVAL-4 INCH | 06530 | 0.000 |
1,000.000 |
$0.850 |
LF | 0.0 |
8001 | PAVE MARK TEMP PAINT LINE ARROW | 20100ES842 | 0.000 |
15.000 |
$31.500 |
EACH | 0.0 |
8003 | PAVE MARKING-PAINT SYMBOL Paint Combo Arrows | 06602NC | 0.000 |
5.000 |
$52.000 |
EACH | 0.0 |
8300 | REMOVE GUARDRAIL | 02381 | 0.000 |
1,200.000 |
$1.450 |
LF | 0.0 |
8401 | FLASHING ARROW | 02775 | 0.000 |
2.000 |
$900.000 |
EACH | 0.0 |
8402 | PAVE STRIPING-TEMP REM TAPE-B | 06549 | 0.000 |
180.000 |
$3.000 |
LF | 0.0 |
8403 | REMOVE PAVEMENT MARKER TYPE V | 06600 | 0.000 |
252.000 |
$5.000 |
EACH | 0.0 |
8404 | PAVE STRIPING-TEMP REM TAPE-W | 06550 | 0.000 |
80.000 |
$2.750 |
LF | 0.0 |
8405 | PERF PIPE HEADWALL TY 2-4 INCH RESTOCK FEE PERFORATED PIPE HEADWALL | 01024 | 0.000 |
23.000 |
$83.700 |
EACH | 0.0 |
8600 | LEVELING & WEDGING PG64-22 | 00190 | 0.000 |
600.000 |
$42.720 |
TON | 0.0 |
8801 | EW~ Slope Excavation | 10091EX | 0.000 |
2,000.000 |
$11.500 |
CUYD | 0.0 |
8802 | EW~ #23 Stone for Refill | 10092EX | 0.000 |
3,000.000 |
$17.550 |
TON | 0.0 |
8803 | EW~ Geotextile Fabric Type IV | 10096EX | 0.000 |
1,600.000 |
$2.350 |
SQYD | 0.0 |
9001 | EW~ Fin Drains to Correct the Dips in the Roadway | 10098NX | 0.000 |
15,093.000 |
$1.000 |
DOLL | 0.0 |
Category Total $3,815,570.34 |
SM- Project | DE011150B0505 | CATEGORY NUMBER | 0002 | CATEGORY Description | CULVERT EXTENSION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0760 | STRUCTURE EXCAV-SOLID ROCK | 08002 | 13.000 |
13.000 |
$75.000 |
CUYD | 0.0 |
0770 | FOUNDATION PREPARATION | 08003 | 1.000 |
1.000 |
$2,000.000 |
LS | 0.0 |
0780 | CONCRETE-CLASS A | 08100 | 91.000 |
91.000 |
$250.000 |
CUYD | 0.6 |
0790 | STEEL REINFORCEMENT | 08150 | 17,033.000 |
17,033.000 |
$0.700 |
LB | 0.3 |
8004 | EW~ Dowel Existing Culvert to Extension | 10090NX | 0.000 |
1.000 |
$3,729.000 |
LS | 0.0 |
Category Total $37,648.10 |
SM- Project | DE011150B0505 | CATEGORY NUMBER | 0003 | CATEGORY Description | SIGNALIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0800 | CONDUIT-1 1/4 INCH | 04793 | 1,175.000 |
1,662.000 |
$2.030 |
LF | 0.1 |
0810 | CONDUIT-2 INCH | 04795 | 160.000 |
679.000 |
$8.120 |
LF | 0.0 |
0820 | JUNCTION BOX TYPE B | 04811 | 13.000 |
21.000 |
$304.570 |
EACH | 0.1 |
0830 | TRENCHING AND BACKFILLING | 04820 | 1,305.000 |
2,310.000 |
$2.030 |
LF | 0.1 |
0840 | LOOP WIRE | 04830 | 5,668.000 |
7,803.000 |
$1.020 |
LF | 0.1 |
0850 | CABLE-NO. 14/5C | 04844 | 950.000 |
1,614.000 |
$1.020 |
LF | 0.0 |
0860 | CABLE-NO. 14/7C | 04845 | 617.000 |
1,109.000 |
$1.020 |
LF | 0.0 |
0870 | CABLE-NO. 14/1 PAIR | 04850 | 8,491.000 |
8,491.000 |
$1.020 |
LF | 0.2 |
0880 | MESSENGER-10800 LB | 04885 | 1,166.000 |
2,059.000 |
$6.090 |
LF | 0.2 |
0890 | LOOP SAW SLOT AND FILL | 04895 | 1,583.000 |
2,400.000 |
$5.080 |
LF | 0.2 |
0900 | BEACON CONTROLLER-2 CIRCUIT | 04930 | 1.000 |
1.000 |
$1,522.840 |
EACH | 0.0 |
0910 | INSTALL CONTROLLER TYPE 170 | 04931 | 2.000 |
3.000 |
$3,045.690 |
EACH | 0.1 |
0920 | INSTALL STEEL STRAIN POLE | 04932 | 10.000 |
12.000 |
$3,045.690 |
EACH | 0.7 |
0930 | REMOVE SIGNAL EQUIPMENT | 04950 | 2.000 |
3.000 |
$507.620 |
EACH | 0.0 |
0940 | TEMP RELOCATION OF SIGNAL HEAD | 20094ES835 | 12.000 |
14.000 |
$101.520 |
EACH | 0.0 |
0950 | INSTALL LED SIGNAL-3 SECTION | 20188ES835 | 8.000 |
14.000 |
$203.050 |
EACH | 0.0 |
0960 | INSTALL LED SIGNAL-5 SECTION | 20189ES835 | 8.000 |
10.000 |
$203.050 |
EACH | 0.0 |
0970 | INSTALL COORDINATING UNIT | 20390ES835 | 2.000 |
2.000 |
$203.050 |
EACH | 0.0 |
0980 | INSTALL LED BEACON-12" | 20408ES835 | 8.000 |
8.000 |
$101.520 |
EACH | 0.0 |
Category Total $86,247.77 |
SM- Project | DE011150B0505 | CATEGORY NUMBER | 0004 | CATEGORY Description | DEMOBILIZATION |
PROJ LN # | Item Description | BID CODE | Bid Qty | Plan Qty | Unit Price | Unit | % of Bid Amt |
0990 | MOBILIZATION | 02568 | 1.000 |
1.000 |
$67,625.000 |
LS | 1.7 |
1000 | DEMOBILIZATION | 02569 | 1.000 |
1.000 |
$60,000.000 |
LS | 1.5 |
Category Total $127,625.00 |